Challenge. Prototype housings passed tests but production castings failed at the bearing seat.
Solution. We moved the part to forged blanks with post-machining, keeping the anodize mask the same.
Result. Duty-cycle failures dropped to zero; volume scaled to 10,000 units/year with 2% safety stock held in our warehouse.