Challenge. The customer's original supplier quoted 12 weeks for injection tooling, putting their audit date at risk.
Solution. We proposed vacuum casting with medical-grade urethane for the first 500 units while production tooling was cut in parallel — same cavity design, zero redesign.
Result. Parts shipped in 3 weeks with full material certificates; the audit passed and the program moved to steel tooling without a single design change.